Ultimate Arch Base
This is a made-to-order product and will typically ship in 1-3 business days after ordering. Times may be longer during the holiday season.
Description
Description
This listing is for Arch Bases only, sold in sets of two.
To purchase a kit with all of the custom parts required to make (1) SFL Designs Ultimate Arch (bases and back braces), click here. Hardware and pipe listed below can be obtained locally.
Arch Back Braces can also be purchased separately here (recommended 3-4 per Dual or Triple Arch Base Set)
These sets do not include the hardware or PEX pipe, but the links below will get you everything you need. Each base is sturdy on its own and interlocks with other arch bases using a 1/2" PVC pipe. That same interlocking pipe doubles as a wide footprint, keeping your arches from tipping forward or backward. Each base is also slotted for standard tent stakes so you can anchor it to the ground.
Our arch bases are made from PETG, a fantastic option recommended for seasonal use.
Inside each arch hole is a small channel that lets you route your power cable from inside the arch out through the bottom. To keep tension on the pixel strip inside the tube, connect a small bungee to the strip and wrap it around the 1/2" EMT pipe that sets the spacing between bases.
Buying Guide:
- Choose your Color - Choose the color of the clip.
- Choose your Arch Style - Choose Single, Dual or Triple Arch Set
-
Add Back Braces - Recommended to use 3-4 per dual or triple Arch Base set. Purchase individual braces here.
- Pipe needed: PEX 1" and PVC or EMT 1/2", see below
- Hardware needed: see below
Pipe
- 1" PEX is available at Lowe's, Home Depot, or Menards (Lowe's links shown here).
- Buy the pipe for the arches in 10' sections rather than a bulk roll.
- Cut or buy the EMT and PVC used for arch spacing and legs in 5' sections. If you use a different length of EMT, the measurements below won't line up.
- We cut our arch pipes to these lengths:
- Outside pipe (Single, Dual & Triple): 108"
- Middle pipe (Dual & Triple): 102"
- Inner pipe (Triple): 96"
Drilling the EMT Pipe
- Align the markings on the pipe to the star in our logo on the bottom of the base, and drill while the pipe is inserted in the base.
- For the second hole, insert the EMT into the opposite base and secure it with a bolt. Then slide the pipe into the second base and, with it laying flat on the ground, start the hole. Once it's started, pick the base up and angle it for easier drilling.
Hardware (per set of two arch bases)
All 18-8 stainless steel. This hardware is not included in your order, but we have provided purchase links below. Prefer zip ties? You can use those instead.
Every set uses 2 EMT bolts (55mm) and 2 PVC bolts (35mm). The arch bolts and nuts depend on your configuration:
-
Single Arch: 4 arch bolts + 8 nuts
-
Dual Arch: 8 arch bolts + 12 nuts
-
Triple Arch: 12 arch bolts + 16 nuts
Arch bolt length: use 45mm for 1" PEX.
Buy the hardware (all M4 × 0.7mm):
EMT Bolt – 55mm · PVC Bolt – 35mm · Arch Bolt – 40mm · Arch Bolt – 45mm · M4 Nut
3D Printing Hobbyists: STL files are available at https://sfl-designs.com/stl-files/
Tech Specs
View full details

Have a question?
Notified by email when this product becomes available
Recommended products
Why Purchase From Above AVL?
We LOVE to connect awesome people with the gear they need to make their events happen.
Our team is available via email or phone to help you find the perfect fit, quote it out for your personalized price, and help get it into your hands!
Here's What Our Customers Say:

Vince Megale
Reilly Arts Center
Aulston Marchant
Everon Event Productions
Anthony "Twig" W.
Lighting HobbyistRecently viewed products
Subscribe to our emails
Be the first to know about new collections and exclusive offers.




